My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARCH 18, 1992
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Board Of Zoning Appeals
>
1990-1999
>
1992
>
MARCH 18, 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 10:11:09 AM
Creation date
4/15/2003 9:39:55 PM
Metadata
Fields
Template:
BZA
BZA - Type
Minutes
DATE
1992-03-18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~)nlv Those $1alemenls Below Thai Have Been Marked Are To Be Considered For This Soils Invoslloall011,. <br /> <br /> ., ~he Olhor Slalemenls Are To Be Disreaarded Because Tbev Do Nol ADDle/. <br /> <br /> (.. ) This silo may be considered lot a subsurface Irench absorplion tleld syslom. Tho Ironch bollom <br /> mlJ$l bo JlLJJ~3sJ 2.'LJ~LI~ abovo any layer wilh a loading tale el loss Ihan 0.25 gpd/sq. II. or groaler Ihan <br /> 1.2 gpd/sq, fl. Il Iho design daily Ilow' is less Ihan 450 gallons, or il lhe lronch Eollom Is al Ioas130 inches <br /> above any layer willr a loading tale BI less Iban 0.25 gpd/sq, t1., a gravily Ilow Irickle Iced syslem may bo <br /> conslrucled. I~ lite design daily Ilow is equal Io or grealer Iban ,450 gallons and il lbo Irencb bollom is wilbin <br /> 30 inches BI a layer wilb a loading tale BI 0.25 gpd/sq, fl., Ihen a melhod BI dosing, such as pump assisled <br /> dislribullon or allernating fields musl bo used because o! lbo proximily of lbo Irencb bollom Io Ihis layer. <br /> Any absorplion lield designed wilb a lolal Irench lenglb BI more Ihan 500 lineal leel musl ulilizo pump <br /> assislod dislribulion In order Io enhance dislribulion BI Ihe ellluenl. II lite Irench bollom is wilbin 24 inches <br /> BI a layer wilb a loading rale BI 1.2 gpd/sq. I1., Ihen pressure dislribulion musl be used. <br /> Doplb Io layer wilh a loading tale BI less Ihan 0.25 gpd/sq, fl.: <br /> Doplh Io layer wilb a loading tale o! more Ihan 1.2 gpd/sq. Il.: <br /> Deplb Io I. ayor wilb a loading tale BI 1.2 gpd/sq. I1.: <br /> (:/~L) 'JlJhe seasonal hiah waler ab e can be owererf o a deplh of al least 34 inches below Ihe surfaco, <br /> hen Ihls si o may be considered for a subsurface Irench absorplion field syslom. The Irench bollom musl <br /> bo ~[ Ioasl 24 incho~ above Ihe seasonal high waler lable aller inslallalion BI lhe drainage syslem. The <br /> Ironcb bollom musl also bo ~3LLo~15L?~I_jQC,~ above any layer wilh a loading tale BI less Iban 0.25 gpd/sq. <br /> 11. or groaler Iban 1.2 gpdlsq, fl. II Ihe design daily flow' is less Ihan 450 gallons, or il lbo trench bollom Is <br /> al Ioas130 inches above any layer wilb a loading rale leSs Ihan 0.25 gpd/sq. I1., Ilion a gravily flow Irickle <br /> Iced syslom may bo conslrucled. II lbo design daily Ilow is equal Io or grealor Ihan 450 gallons, and il Iho <br /> Ironch bollom is wilhin 30 inches el a layer wilh a loading tale BI 0.25 gpdlsq. 11., Iben a melbod BI dosing, <br /> such as pump assisled dislribulion or allornaling fields musl be used because BI Ibe proximily BI lbo Ironcb <br /> bollom Io Ibis layer. Any absorplion lield designed wilb a Iolal Irench lenglh of more Iban 500 lineal 1ool <br /> musl bo dosed using pump assisled dislribulion in order Io enhance dislribulion BI Ihe ellluenl. II lbo <br /> Ironcb bollom is wilbin 24 inches of a layer wilb a loading rale BI 1.2 gpd/sq. I1., Ilten pressure dislribulion <br /> musl be used. <br /> Doplh Io layer wilh a loading tale o! less Iban 0.25 gpcl/sq. I1.: <br /> Doplb Io layer wllh a loading tale BI more Iban 1.2 gpd/sq. I1.: <br /> Deplb Io layer wilb a loading tale of 1.2 gpd/sq. I1.: <br /> <br /> ( ) The poor filleting qualilles BI Ibeso sand lexluros ;,'vilbln lite soil profile can allow Improperly trealod <br /> ellluonl Io baler and conlaminale lhe ground waler unless a pressure dislribulion syslem is used. <br /> <br /> (/~ ) Surfaco diversions arb required Io remove Ihe excess sudaco waler lrom Ihe proposed soplic area. <br />( ) Subsurface drainage, perlmelor drainage, and surface diversions are required I~) ~emovo Iho excess <br />surlace and subsudaco waler Item lire proposed seplic area. <br /> <br />( ) This silo may be considered Ior an .elovaled sand rebuild because Ibe deplb Io lbo seasonal blgl'J <br />waler lablo and limiling layer Is grealer Iban 20 inches, and Ibe slope is less Ihan 6 percent. <br /> <br />( ) II lite seasonal high waler can be lowered lo a deplb BI more Ihan 20 inches, Ibis silo may bo <br />considered lot an elevaled sand mound. <br /> <br />(... ) This silo Is ~ Ior any subsurface syslem because BI lbo presence of a Ilmlllng layer wllhla <br />34 Inches of Iho soil surface. <br /> <br />(..) This silo Is unsulled for any on-silo sewage disposal syslem because ( )[Of Flooding/Pending]; <br />( )[Of Posillon In The Landscape (Flood Plain or Some Olhor Topograpbic Posillon)]; ( )[OI The <br />Presence O! A Limiling Layer Wilhin 20 Inches Of Tho Soil Sudace]; ( )lei Slopes Grealer Than 15 <br />Percenl]. IA comblnalion of a limiling layer wilhin 34 Inches and a slope grealer titan 6 percenl]. An <br />allernale silo should be selecled. <br /> <br />Any syslem recommendalions Included In Ihls repod are based on lhe slope, posilion In landscape, deplh <br />1o any Iimiling layers and soil prolile descriplion at each silo. Consideralions such as lhe size o! area <br />available, Iol conliguralions, nocessap/selback and soparalion dislanceso feasibilily el adilicial drainage, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.