Laserfiche WebLink
Supt. Callahan updated the Board on the State zip line inspection. Stage panels for the concert series <br />will be installed before the first concert, and the playground tiles will be shipped soon. The recoating <br />of the pool slide will be before the pool opening. <br />After taking time to read the Cultural Rise contract, A motion was made by Mark Taylor to resend the <br />table of signing the Cultural Rise contract, seconded by David Pearson. Motion carried. <br />Motion to approve the signing of the Cultural Rise contract. Motion made by Mark Taylor, seconded <br />by Erin Bechtold. Motion carried. <br />Claims approved as presented. Motion made by David Pearson seconded by Mark Taylor. Motion <br />carried. <br />The next meeting is on June 14, 2021, at 7:00 pm at the Mooresville Public Library. <br />The meeting was adjourned by David Pearson, seconded by Lynn Adams. Motion carried. <br />r.X�XL - <br />Brian Wiser - President <br />Danny Shaw - Secretary <br />