5.2 A proposal to focus on Schematic Design from Lehman & Lehman was presented to the Board. <br />The schematic design proposal is an extension of our original contract agreement with Lehman <br />and Lehman. The plan takes the Park to the final stage before bidding out the project and <br />drafting and finalizing construction documents. This amount would come from our Capital <br />Non -Reverting fund. The board discussed the schematic design proposal. <br />5.2.1 After discussion, upon a motion by Danny Lundy, seconded by Lynn Adams, the Board <br />voted 6/0 to approve the schematic design proposal from Lehman & Lehan, funds from the <br />Capital Non -Reverting not to exceed $106,000.00. <br />5.3 A proposal to focus on Schematic Design from Lehman & Lehman was presented to the Board. <br />The schematic design proposal is an extension of our original contract agreement with <br />Lehman and Lehman. The plan takes the Park to the final stage before bidding out the project <br />and drafting and finalizing construction documents. This amount would come from our Capital <br />Non -Reverting fund. The board discussed the schematic design proposal. <br />5.3.1 After discussion, upon a motion by Danny Lundy, seconded by Lynn Adams, the Board <br />voted 6/0 to approve the schematic design proposal from Lehman & Lehan, funds from the <br />Capital Non -Reverting not to exceed $106,000.00. <br />5.4 The Department's current five-year master plan (2019-2024) expires at the end of 2024. A new <br />plan needs to be submitted to the Indiana Department of Natural Resources by November <br />15, 2024. The cost for a new Strategic Five-year Master Plan will be between $30,000 - <br />$60,000. Board discussed the new Strategic Five-year Master Plan. <br />5.4.1 After discussion, upon a motion by Danny Lundy, seconded by Danny Shaw, the Board <br />voted 6/0 to approval to release an RFP for the new Strategic Five-year Master Plan with the <br />best practice to receive three quotes. <br />6. NEW BUSINESS <br />6.1 Staff seek the approval and acceptance of a quote for the contract services to replace the <br />electronic sign and update the entrance of Pioneer Park. Three quotes were submitted for <br />discussion. The board discussed the three submitted quotes to replace the electronic and the <br />updated entrance at Pioneer Park. <br />6.1.1 Upon a motion by Mark Taylor, seconded by Danny Lundy, the Board voted 5/0, to award <br />DG Graphics quotes with fund from the Donation Account not to exceed $39,340.80. M. Saner <br />abstains from vote. <br />6.2 Staff seek direction for the 2024 Eclipse and if the Parks will be allowing camping in the <br />park during that weekend leading up to the Eclipse on Monday April 8th. Board discussed <br />camping in the park during the 2024 Eclipse weekend. <br />