My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 03-2024 Stormwater Management Ordinance
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
ORDINANCES & RESOLUTIONS
>
2024
>
Ordinance 03-2024 Stormwater Management Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 2:50:20 PM
Creation date
7/18/2024 2:44:44 PM
Metadata
Fields
Template:
ORDINANCES_&_RESOLUTIONS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As-builts - As -built drawings shall be completed within 30 days after the completion of the <br />project and submitted to the PWO. Electronic record drawings shall include a pdf file of the <br />plans completed by a professional engineer or land surveyor with changes made during <br />construction shall be marked on the as-builts in a contrasting color in order to easily see the <br />revisions. <br />4.0 Detention Requirements <br />Detention shall be required for SWMPA for all proposed projects that disturb 10,000 sq. ft, or <br />more acre of land. In addition, detention may be required for any development in areas where <br />downstream flooding has been identified by the Town. <br />The following projects may complete a Runoff Curve Number Worksheet per the Mooresville <br />Stormwater Design Manual, Upon PWO approval, detention requirements for the project shall <br />be waived.; <br />(1) Land -disturbing activities where there will <br />associated with the final completed project <br />(2) Single-family residential strip development <br />improvements and the project is not part of a <br />sale. <br />be no additional impervious surfaces <br />offered for sale or lease without land <br />larger conuuon plan of development or <br />(3) Individual residential building lots within a permitted project site. <br />(4) Residential developments consisting of four (4) or fewer lot developments where the <br />proposed impervious surfaces are 10% or less of the project acreage. Impervious is <br />determined by the sum of all infrastructure (roads, paths, parking, etc.) and the average <br />projects hard surfaces associated with all building lots within the project. <br />(5) Single family residences and private ponds that are not part of a larger common plan of <br />development or sale. <br />Pre- and post -developed nmoff rates shall be determined using methodologies specified in the <br />Mooresville Stormwater Design Manual. <br />The following requirements shall be fulfilled for all detention facilities; <br />4.1 The runoff from the developed condition peals storm with a 100 -year return period <br />storm shall be limited to the runoff rate from the pre -developed condition peak <br />storm with a 10 -year return period storm. <br />4.2 The runoff from the developed condition peals storm with a 10 -year return period <br />storm shall be limited to the runoff rate from the pre -developed condition peak <br />storm with a 2 -year return period storm. <br />4.3 There shall be no increase in the runoff rate from the pre -developed conditions to <br />the post -developed conditions for all storms at all discharge points along the <br />property line. <br />4.4 An adequate downstream receiving facility shall be identified on the plans and <br />evaluated in the drainage report. There shall be no increase in erosion potential on <br />TOWN OF MOORESVILLE STORMWATER MANAGEMENT ORDINANCE <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.