My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 03-2024 Stormwater Management Ordinance
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
ORDINANCES & RESOLUTIONS
>
2024
>
Ordinance 03-2024 Stormwater Management Ordinance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 2:50:20 PM
Creation date
7/18/2024 2:44:44 PM
Metadata
Fields
Template:
ORDINANCES_&_RESOLUTIONS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the provisions of any article, section, subsection, paragraph, subdivision or clause of <br />this Ordinance shall be judged invalid by a court of competent jurisdiction, such order <br />of judgment shall not affect or invalidate the remainder of any article, section, <br />subsection, and paragraph. <br />1.8 Fees <br />The fee schedule for Stormwater Management Permit, Review, Inspection, and Penalties <br />shall be according to the following: <br />(1) <br />Minor Subdivision —Primary and Final <br />$ 250.00 <br />(2) <br />Major Subdivision -Primary <br />$ 450.00 <br />3 <br />Major Subdivision Each Section - Secondary <br />$ 250,00 <br />4 <br />Planned Unit Development Preliardnary Plan <br />$ 250.00 <br />5 <br />Planned Unit Development Final Detailed Plan Each Phase <br />$ 450.00 <br />6 <br />Revision or Amendment to a Recorded or Approved Plat <br />$ 250.00 <br />7 <br />Lot Site Plan Review — Business Industrial & Multi -Family <br />$ 350.00 <br />8 <br />Lot Site Plan Review — Residential single and two-family <br />$ 100.00 <br />(9) <br />Revision or Amendment to Approved Site Plan — Business <br />$ 250,00 <br />Industrial & Multi Family <br />(10) <br />Revision or Amendment to Approved Site Plan — Residential <br />$ 75.00 <br />single and two-family <br />(11) <br />Annual inspection for each permitted BMP or detention/retention <br />$ 250.00 <br />facility <br />(12) <br />Failure to maintain an approved BMP and/or detention/retention <br />Not less than <br />facility, Section 12.4 <br />$200.00 or more <br />than $1,000.00 per <br />BMP or facility <br />per violation <br />(13) <br />Failure to maintain plan approved easements, Section 13,1 <br />Not less than <br />$100,00 or more <br />than $500.00 per <br />violation <br />(14) <br />Failure to have annual inspection of BMP and/or <br />$300.00 for each <br />detention/retentionfacility, Section 13.3 <br />BMP or <br />detention/retenticn <br />facility <br />ALL FEES ARE NONREFUNDABLE, EACH OF THE ABOVE MINIMUM BASE FEES <br />INCLUDES A $50,00 ADMINISTRATIVE FEE AND ENGTNEERRVG REVIEW FEE AT THE <br />RATE OF $100.00 PER HOUR. IF THE ENGINEERING REVIEW REQUIRES MORE TIME <br />THAN THE ABOVE FEES COVERS THEN THE ADDITIONAL TIME REQUIRED FOR <br />REVIEWS WILL BE CHARGED AT THE RATE OF $100.00 PER HOUR, THE FEE SHALL BE <br />PAID IN FULL TO THE TOWN OF MOORESVILLE BEFORE A PERMIT IS ISSUED. <br />1.9 Development of a Stormwater Design Manual <br />TOWN OF MOORESVILLE' STORMWATER MANAGEMENT ORDINANCE <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.