Laserfiche WebLink
<br />. - <br /> <br />. <br /> <br />is 300 feet long. They will need to obtain a three year performance bond. Motion was <br />made by Commissioner McGuire, second by Commissioner Williamson to amend the <br />plat to allow a two foot wide paved addition to Bethel Church Road as the County <br />Engineer wanted and a performance bond of $27,000.00 to the Town of Mooresville. <br />Motion carried 7-0. <br /> <br />Building Inspector Joe Beikman reported thirty-one (31) permits and fifty-six (56) <br />inspections. <br /> <br />There being no further business to come before the commission at this time a motion was <br />made by Commissioner Bruner, second by Commissioner Corbin to adjoum the meeting. <br />Motion carried 7-0. <br /> <br />The next meeting of the Mooresville Plan Commission will be held on <br />25, 2002, at 7:00 P. M. at the Mooresville Town Hall. <br /> <br /> <br />, April <br /> <br />ATTEST: <br /> <br />~ vgfJ~ <br />Secretar() <br /> <br />[~ <br />