Laserfiche WebLink
<br />I <br /> <br />402,2 <br /> <br />I . <br /> <br />II. <br /> <br />III. <br /> <br />IV. <br /> <br />V. <br /> <br />VI, <br /> <br />VII. <br /> <br />VIKI. <br /> <br />IX. <br /> <br />industrial wastes <br />shall comply with <br /> <br />and other wastes to the POTW <br />all terms of this Ordinance. <br /> <br />Disclosure Forms. Industrial Dischargers shall <br />complete and file with the Authority, a disclosure <br />declaration in the form prescribed by the Authority <br />and accompanied by the appropriate fee. Existing <br />Industrial Dischargers shall file disclosure forms <br />within 30 days after the effective date of this <br />Ordinance, and proposed new Dischargers shall file <br />their disclosure forms at least 90 days prior to <br />connecting to the POTW. The disclosure to be made <br />by the Discharger shall be made on written forms <br />provided by the Authority and shall cover: <br /> <br />Disclosure of name, address, <br />Discharger. <br /> <br />and location of the <br /> <br />Disclosure of Standard Industrial Classification <br />(SIC) number according to the Standard Industrial <br />Classification Manual, Bureau of the Budget, 1972, <br />as amended. <br /> <br />Disclosure of wastewater constituents and charac- <br />teristics including but not limited to those <br />mentioned in this Ordinance as determined by bona <br />fide chemical and biological analyses. Sampling <br />and analysis shall be performed in accordance with <br />procedures established by the D,S. EPA and <br />contained in 40 CFR, Part 136, as amended. <br /> <br />Disclosure of time and duration of discharges. <br /> <br />Disclosure of average daily and instantaneous peak <br />wastewater flow rates, in gallons per day, <br />including daily, monthly and seasonal variations, <br />if any. All flows shall be measured unless other <br />verifiable techniques are approved by the Authority <br />due to cost or nonfeasibility, <br /> <br />Disclosure of site plans, floor plans, mechanical <br />and plumbing plans and details to show all sewers, <br />sewer connections, inspection manholes, sampling <br />chambers and appurtenances by size, location and <br />elevation. <br /> <br />Description of activities, facilities and plant <br />processes on the premlses, including all materials <br />which are or maybe discharged to the sewers or <br />works of the Authority. <br /> <br />Disclorure of the nature and concentration of any <br />pollutants or materials prohibited by this <br />Ordinance in the discharge, together with a <br />statement regarding whether or not compliance is <br />being achieved with this Ordinance on a consistent <br />basis, and, if not, whether additional operation <br />and maintenance activities and/or additional <br />pretreatment is required for the Discharger to <br />comply with this Ordinance. <br /> <br />Where additional pretreatment and/or operation and <br />maintenance activities will be required to comply <br />with this Ordinance, the Discharger shall provide a <br />declaration of the shortest schedule by which the <br />Discharger will provide such additional <br />pretreatment and/or implementation of additional <br />operation and maintenance activities. <br /> <br />(A) The schedule <br />the commencement <br />leading to the <br /> <br />shall contain milestone dates for <br />and completion of major events <br />construction and operation of <br /> <br />-19- <br />