Laserfiche WebLink
<br />(65) Peak Storm - The storm of a specified return period that produces the <br />maximum runoff from a site or the maximum elevation in a detention pond. <br />Storm durations of 0.5-, 1-, 2-, 3-, 6-, 12- and 24-hours shall be used to <br />determine the peak storm. <br /> <br />(66) Perimeter Drain - A subsurface pipe network designed and installed around <br />the perimeter of a septic field for the purpose of effectively collecting and <br />draining away excess subsurface waters. <br /> <br />(67) Person - An individual, firm, partnership, association, public or Private <br />Corporation, public agency, instrumentality, or any other legal entity. <br /> <br />(68) Pipe System - Two or more pipes connected together by one or more <br />structures such as a manhole designed to convey stormwater runoff. <br /> <br />(69) Plan - Written narratives, specifications, drawings, sketches, written <br />standards, operating procedures, or any combination of these, which contain <br />information pursuant to this Ordinance. <br /> <br />(70) Pollutant - A substance which causes or contributes to pollution which <br />includes, but is not limited to the following: any dredged spoil, solid waste, <br />vehicle fluids, yard wastes, animal wastes, agricultural waste products, <br />sediment, incinerator residue, sewage, garbage, sewage sludge, munitions, <br />chemical wastes, biological wastes, radioactive materials, heat, wrecked or <br />discharged equipment, rock, sand, cellar dirt, and industrial, municipal, <br />commercial and agricultural waste, or any other contaminant or other <br />substance defined as a pollutant under the Clean Water Act. <br /> <br />(71) Pollution - The human-made or human-induced alteration of the quality of <br />waters by waste to a degree which unreasonably affects, or has the potential to <br />unreasonably affect, either the waters for beneficial uses or the facilities which <br />serve these beneficial uses. <br /> <br />(72) Property Owner - Any person having legal or equitable title to property, <br />having a contractual interest in property, or any person having or exercising <br />care, custody, or control over any property. <br /> <br />(73) Reclamation Plan for Mineral Extraction - A document illustrating drainage <br />patterns, both existing and proposed, at a mineral extraction site; proposed <br />erosion control and off-site sedimentation control of the site; and proposed <br />final land use and post construction stormwater quality BMPs for the site, all <br />of which are documented at the initial approval of the SWMP and at lO-year <br />intervals following the approval of a SWMP. <br /> <br />MOORESVILLE STORMW ATER MANAGEMENT ORDINANCE <br />13 <br />