Laserfiche WebLink
<br />At such time as the PWO determines that all requirements of this Ordinance are met, a <br />formal notice of approval (SWMP A) shall be issued by the PWO. <br /> <br />Any construction project holding a SWMP A, determined to be inconsistent with plans <br />previously approved by the PWO may be subject to the articles of section 11 of this <br />Ordinance (Enforcement). Any changes in a set of SWMP approved by the PWO must be <br />submitted to the PWO and re-approved as a revision. Additional hourly review fees will <br />be applicable to this revision review. <br /> <br />A SWMPA shall expire two (2) calendar years from the date of issuance. At expiration <br />previously permitted development underway may continue construction activities under <br />the terms of the original SWMP A. Previously approved development not underway at <br />the time of expiration shall be required to obtain a new SWMP A per this Ordinance prior <br />to the initiation of construction activities. <br /> <br />4.0 Detention Requirements <br /> <br />Detention shall be required for all proposed developments where the runoff rate from the <br />proposed post-developed conditions shall increase when compared to the pre-developed <br />conditions. In addition, detention may be required for any development in areas where <br />downstream flooding has been identified by the PWO. The pre- and post-developed <br />runoff rates shall be determined using methodologies specified in the Mooresville <br />Stormwater Design Manual. <br /> <br />The following requirements shall be fulfilled for all detention facilities: <br /> <br />4.1 The runoff from the developed condition peak storm with a lDO-year return <br />period storm shall be limited to the runoff rate from the pre-developed <br />condition peak storm with a lO-year return period storm. <br /> <br />4.2 The runoff from the developed condition peak storm with a lO-year return <br />period storm shall be limited to the runoff rate from the pre-developed <br />condition peak storm with a 2-year return period storm. <br /> <br />4.3 There shall be no increase in the runoff rate from the pre-developed conditions <br />to the post-developed conditions for all storms at all discharge points along <br />the property line. <br /> <br />4.4 An adequate downstream receiving facility shall be identified on the plans. <br />There shall be no increase in erosion potential on the adjoining properties. <br /> <br />4.5 Earthen embankments, dams and/or berms designed and constructed to detain <br />or impound stormwater shall be designed using criteria specified in the <br />Mooresville Stormwater Design Manual. <br /> <br />MOORESVILLE STORMW ATER MANAGEMENT ORDINANCE <br />17 <br /> <br />.-- -...----- <br /> <br />--~-- <br /> <br />- ------ <br /> <br />-_.._~-_._--"--~---_.,_. <br /> <br />--- <br />