My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolutions 2017
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
ORDINANCES & RESOLUTIONS
>
2010-2019
>
2017
>
Resolutions 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 2:07:04 PM
Creation date
2/6/2019 2:06:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wireless facility. <br />(c) Any proposed wireless support structure shall be <br />designed, and engineered structurally, <br />electrically and in all other respects, to <br />accommodate both the initial wireless facility <br />and one potential additional wireless facility <br />support structure shall be designed to allow for <br />future rearrangement of cellular communication <br />equipment and antennas upon the structure and to <br />accept cellular communication equipment and <br />antennas mounted at varying heights. <br />(d) Typically, a waiver for a new wireless support <br />structure will not be approved unless the person <br />submits verification that the telecommunication <br />equipment planned for the proposed wireless <br />support structure cannot be accommodated on an <br />existing or approved utility pole or electrical <br />transmission tower or other structure due to one <br />(1) or more of the following reasons: <br />(1) The planned telecommunication equipment <br />would exceed the structural capacity of the <br />existing or approved utility pole or <br />electrical transmission tower, buildings or <br />structures as documented by a qualified and <br />licensed professional engineer and the <br />existing or approved utility pole or <br />electrical transmission tower, buildings or <br />structures cannot be reinforced, modified or <br />replaced to accommodate the planned <br />telecommunication equipment at a reasonable <br />cost, or <br />(2) The planned telecommunication equipment <br />would cause interference impacting the <br />usability of other existing <br />telecommunication equipment at the site if <br />placed on existing structures. Supportive <br />documentation by a qualified and licensed <br />professional engineer indicating that the <br />interference cannot be prevented at a <br />reasonable cost; or <br />(3) The existing or approved utility pole or <br />electrical transmission tower, buildings or <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.