Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />areas inside or outside the corporate limits of the Town of <br /> <br /> <br />Mooresville, sewer users shall pay a Connection Cost based on an <br /> <br /> <br />"equivalent development unit" (EDU Factor) pursuant to Attachment <br /> <br /> <br />Number 1 for a single family residence, which is hereby initially <br /> <br /> <br />fixed and established at $900.00. This unit cost per EDU assumes <br /> <br /> <br />an average daily EDU wastewater flow of 300 gallons per day at a <br /> <br /> <br />unit cost for additional wastewater treatment capacity of $3.00 per <br /> <br /> <br />gallon of plant capacity. New sewer connections in conjunction <br /> <br /> <br />with their designated type of service referenced in Attachment <br /> <br /> <br />Number 1 will presently pay a connection cost based on the <br /> <br /> <br />multiplication of the listed EDU factor times $900.00. The <br /> <br /> <br />equi valent user cost, may, from time to time, be updated and <br /> <br /> <br />changed by the Town. Funds collected, including inspection costs, <br /> <br /> <br />shall be deposited into the Town of Mooresville Plant Expansion and <br /> <br /> <br />Improvement Fund. Funds collected shall be used for the expansion <br /> <br /> <br />and other capital improvements of sewerage facilities including <br /> <br /> <br />bond payments on past capital projects and future capital projects <br /> <br /> <br />relating to the Mooresville Sewerage System. <br /> <br /> <br />Connection of users not listed in Attachment Number 1 (which <br /> <br /> <br />is attached hereto and made a part hereof) or any user which the <br /> <br /> <br />Town Council believes to vary substantially (substantially meaning <br /> <br /> <br />by more than fifteen (15) percent from the EDU factor listed in <br /> <br /> <br />Attachment Number 1 or a user who due to some unique characteristic <br /> <br /> <br />does not fit in any category listed on Attachment Number 1) shall <br /> <br /> <br />have it's EDU factor determined by the Town Council based on <br /> <br /> <br />projected EDU wastewater flows or any other equitable means as <br /> <br />2 <br />