Laserfiche WebLink
NMI <br />July 26, 2018 <br />The Mooresville Town Council met in a special meeting on Thursday, July 26, 2018 at 5:00 P. M. at the <br />Mooresville Government Center. <br />Purpose of this meeting was to open some bids for the remodel of the Police Station on South Indiana <br />Street. <br />Town Council members present were: Tom Warthin, President, David Rogers, Vice -President, Joe <br />Beikman, Dustin Stanley, and Mark Mathis. No members were absent. Town Attorney Mel Daniel was <br />present. <br />Prayer: David Rogers <br />No minutes. <br />Open bids: <br />Perry Acoustics ceiling tile $21,200 Alternates 1,2,3,4,5, no bid <br />Alternate 5 2x4 grid Deduct $1,000 $20,200 <br />Harold Fish, Inc mechanical/plumbing $440,440 Alternate 1, $333,333 with <br />using some of the same equipment, Alt. 2 add $2,828., Alt. 3 Provide natural gas generator add <br />$12.421, 4 and 5 No alternate. <br />Electrical Plus Electrical $135,000 Alternate 1 provides <br />centralized air, Minus $4,500, Alt 2use part of existing equipment minus $2,500, Alt. 3 Natural Gas <br />generator to power whole building $152,300, Alt. 4 Relocate diesel generator add $15,200, Voluntary: <br />Light fixture package minus $10,000. 11 <br />Sun Electric, Inc. Electrical $185,000 Alternate 1, minus $600, <br />Alt. 2 No bid, Alt. 3 Provide Natural Gas Generator $152,800, Alt. 4 Relocate of generator $8,000, <br />Voluntary alternate-,yse Hubbell lighting a savings of $9,495., Voluntary Use Diesel generator a savings <br />of $45,000. . <br />Economy Heat, Air, & Plumbing <br />Mech/Plumbing <br />$316,980.00 <br />Alternate 1 297,394, <br />Alt. 2 no bid, Alt. 3 Natural gas line <br />only Plus $1, 270. <br />William Wittman <br />Plumbing <br />$46,000 <br />No Alternatives/add- <br />ons <br />KG Masonry Service <br />Masonry <br />$$49,860 <br />No alternatives <br />Browning Chapman LLC <br />Epoxy Floor <br />$ 82,500 <br />Alt. 1, Additional floor <br />patch and remodel, add $11,475.00",2. <br />Moisture mitigation, add $9,435.00. <br />Blakely Corp. <br />Epoxy Floors <br />$109,500 <br />No alternatives <br />HES painting Co. <br />Painting <br />$ 19,250 <br />No alternatives <br />Indiana Painting Co. <br />Painting <br />$ 23,040 <br />No alternatives <br />Carriage House Woodworking <br />Overhead Door Co. of Indpls. <br />—"—' - �—No alternatives <br />Casework/cabinets $ 60,722.90 <br />Doors $ 17,395. No alternatives <br />C P &Associates Painting $ 24,375. <br />frames, 2. 11 stained doors minus $85 per door if not stained. <br />Lee Company <br />Casework <br />FITE Plumbing Plumbing <br />$875.00 Alternative 2 permanate natural gas minus $1400.00 <br />Nu -Crete Construction concrete & Excavation <br />r'r <br />Sunco Construction General Construction pkg. <br />replacing existing shingles with 3 dimensional add $'38,999. <br />Rooks Company <br />Drywall and insulation <br />$ 50,490 <br />$ 49,400 <br />$ 83,678 <br />$ 152,255 <br />� <br />1. Alternative, door <br />No alternatives <br />Alternative 1 Add <br />No Alternatives <br />Alternative 1, <br />No alternatives <br />