<br />July 26, 2018
<br />The Mooresville Town Council met in a special meeting on Thursday, July 26, 2018 at 5:00 P. M. at the
<br />Mooresville Government Center.
<br />Purpose of this meeting was to open some bids for the remodel of the Police Station on South Indiana
<br />Street.
<br />Town Council members present were: Tom Warthin, President, David Rogers, Vice -President, Joe
<br />Beikman, Dustin Stanley, and Mark Mathis. No members were absent. Town Attorney Mel Daniel was
<br />present.
<br />Prayer: David Rogers
<br />No minutes.
<br />Open bids:
<br />Perry Acoustics ceiling tile $21,200 Alternates 1,2,3,4,5, no bid
<br />Alternate 5 2x4 grid Deduct $1,000 $20,200
<br />Harold Fish, Inc mechanical/plumbing $440,440 Alternate 1, $333,333 with
<br />using some of the same equipment, Alt. 2 add $2,828., Alt. 3 Provide natural gas generator add
<br />$12.421, 4 and 5 No alternate.
<br />Electrical Plus Electrical $135,000 Alternate 1 provides
<br />centralized air, Minus $4,500, Alt 2use part of existing equipment minus $2,500, Alt. 3 Natural Gas
<br />generator to power whole building $152,300, Alt. 4 Relocate diesel generator add $15,200, Voluntary:
<br />Light fixture package minus $10,000. 11
<br />Sun Electric, Inc. Electrical $185,000 Alternate 1, minus $600,
<br />Alt. 2 No bid, Alt. 3 Provide Natural Gas Generator $152,800, Alt. 4 Relocate of generator $8,000,
<br />Voluntary alternate-,yse Hubbell lighting a savings of $9,495., Voluntary Use Diesel generator a savings
<br />of $45,000. .
<br />Economy Heat, Air, & Plumbing
<br />Mech/Plumbing
<br />$316,980.00
<br />Alternate 1 297,394,
<br />Alt. 2 no bid, Alt. 3 Natural gas line
<br />only Plus $1, 270.
<br />William Wittman
<br />Plumbing
<br />$46,000
<br />No Alternatives/add-
<br />ons
<br />KG Masonry Service
<br />Masonry
<br />$$49,860
<br />No alternatives
<br />Browning Chapman LLC
<br />Epoxy Floor
<br />$ 82,500
<br />Alt. 1, Additional floor
<br />patch and remodel, add $11,475.00",2.
<br />Moisture mitigation, add $9,435.00.
<br />Blakely Corp.
<br />Epoxy Floors
<br />$109,500
<br />No alternatives
<br />HES painting Co.
<br />Painting
<br />$ 19,250
<br />No alternatives
<br />Indiana Painting Co.
<br />Painting
<br />$ 23,040
<br />No alternatives
<br />Carriage House Woodworking
<br />Overhead Door Co. of Indpls.
<br />—"—' - �—No alternatives
<br />Casework/cabinets $ 60,722.90
<br />Doors $ 17,395. No alternatives
<br />C P &Associates Painting $ 24,375.
<br />frames, 2. 11 stained doors minus $85 per door if not stained.
<br />Lee Company
<br />Casework
<br />FITE Plumbing Plumbing
<br />$875.00 Alternative 2 permanate natural gas minus $1400.00
<br />Nu -Crete Construction concrete & Excavation
<br />r'r
<br />Sunco Construction General Construction pkg.
<br />replacing existing shingles with 3 dimensional add $'38,999.
<br />Rooks Company
<br />Drywall and insulation
<br />$ 50,490
<br />$ 49,400
<br />$ 83,678
<br />$ 152,255
<br />�
<br />1. Alternative, door
<br />No alternatives
<br />Alternative 1 Add
<br />No Alternatives
<br />Alternative 1,
<br />No alternatives
<br />
|