My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUG. 19, 1998
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Board Of Zoning Appeals
>
1990-1999
>
1998
>
AUG. 19, 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 10:11:14 AM
Creation date
4/15/2003 9:39:55 PM
Metadata
Fields
Template:
BZA
BZA - Type
Minutes
DATE
1998-08-19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PETITION <br /> <br />Town of Mooresville Board of Zoning Appeals <br /> <br /> Plan Commission Docket No. <br /> <br />JUL 1 1996 <br /> <br />PETITIONS: <br /> <br />Date of Filing. <br /> <br />Salne: <br />Address: <br />Phone: <br /> <br />Hoosier Energy REC, Inc., c~to Douglas R. Emmons <br />P.O. Box 908, Bloomington. ~qq 47402 <br />1-812-876-0258 or 876-0347 <br /> <br />SUMMARY OF SPECIAL EXCEPTION SOUGHT BY THIS PETITION: <br /> <br />Construction of three-fourths (0.75) mile of wood and steel pole 69 'kilovolt <br />electric transmission power line. The proposed line is the final phase of a <br />transmission tie line to provide an alternate power source to three electric <br />substations in the area, ie; Mooresville substation (serving Woods Wire Industry), <br />Hart Lake substation (serving General Shale and local distribution, and Wilher <br />substation (serving local distribution customers). <br /> <br />The south end of the proposed power line would attach to an existing line xvhich <br />now terminates on the east side of Southbridge Crossing and mn east. across the <br />Southern Indiana railroad tracks, one-thousand-fifty (1050) ;.~et on private right -~f- <br />way, thence turn north and mn about eleven-hundred-seventy (1170) feet along the <br />west side of Park Drive, thence mn northeast one-hundred-seventy (170) feet and <br />then ease across the north portion of the waste water treatment property a distance <br />of about three-hundred-twenty (320), thence northeast about four-hundred-fifty <br />(450) feet (crossing the White LickCreek)to just south of the State Road g67 <br />South right-of-way, thence southease adjacent to said right-of-way for about six- <br />hundred (600) feet (crossing S.R. #144) to terminate at the existing transmission <br />line. <br /> <br />Real Estate Affected: Construction will be on private property (purchased easement) and <br /> public road right-of-way along Park Drive and upon City of Mooresville waste <br /> water treatment property (purchased easement).The crossing of White Lick Creek <br /> as specified by the Indiana Department ofblatural Resources as per the permitting <br /> provisions of the Flood Control Act <br /> <br />Attached Drawings: 3540D-100, sht. 4 <br />The above information is tree and correct to my knowledge and belief~__ <br /> <br />Hoosier Energy REC, Inc ................................................ ..,'~/-~l,'t~ ~--/?ffFT/~'/ <br /> /'~'~-- ~'~~anin Poteat / Agent <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.