My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/23/05
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Plan Commission
>
2000-2009
>
2005
>
6/23/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2007 12:43:41 PM
Creation date
5/26/2006 4:10:32 PM
Metadata
Fields
Template:
Clerk Treas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Commissioner Ehrhart asked in accessing lots 30, 31, 32, and 33 there is not an alley <br />behind these. Mr. Holloway said there would be a common access from between lot 102 <br />and 103. Commissioner Young asked if the garages would not face the street and would <br />all the utilities would be behind the homes and Mr. Holloway said that was correct. He <br />said unfortunately there would be a few transformers and fire hydrants along the street. <br />He said the transformers will be landscaped. <br /> <br />Motion to approve Section Two final plat for Village of Eastmore was made by <br />Commissioner Ehrhart, second by Commissioner Berwick. Motion carried 7-0. <br /> <br />Ross Holloway, Holloway Engineering, representing Larry Neer, for plat approval for <br />PUD-R named Bridgemore Village, formerly Amberwood, which is a Condominium <br />concept and the preliminary plat will carry the covenant and restrictions and <br />condominium by-laws. Karen and Larry Neer have a project in Westfield so you could <br />get a feel for this project. The parcel is twenty-three point nine (23.9) acres and <br />everything outside the walls of the condominium units will be common area and parks <br />that will be maintained by the condominium homeowners association. There will be one <br />hundred eight (108) homes plus one clubhouse. This parcel is currently approved for <br />eight-eight (88) units with no clubhouse and amenities. Gross density is 4.5 homes per <br />acre which is not too far off from what has been approved for this site, which is 3.3 and <br />4.2. It is currently zoned PUD-R so it does not have to go before the town council. <br />They have given an annexation request to Mr. Currens, which is signed and notarized by <br />the owner, and they meet the one-eighth contiguity required for annexation. The <br />development standards will apply to all of these homes with the exterior being brick, <br />stone, wood or hardy plank. The brick is balanced completely around the side ofthe <br />unit, the landscaping is detailed and they have 8/12 pitch roofs. They will present a <br />landscaping plan to the plan commission in detail for every unit. All homes will have <br />hard surface drives and 12 pitch roofs. The minimum square footage will be 1325 sq. ft. <br />and the average will probably be 1800 to 2000 sq. ft. and all will have a two (2) car <br />attached garage. All of the landscaping, driveways, streets, exterior of building, <br />stormwater system, retention areas and everything will be maintained by the homeowner <br />association. Nothing will be dedicated to the town of Mooresville except the sanitation <br />system and easement will be provided for the sanitary sewer that is acceptable to the <br />town. They will have private streets and restrictive entrance so they can maintain the <br />traffic. There will be a clubhouse of2900 sq. ft. which will be built first and it will have <br />a 20 X 39 foot pool. There will be a walking path, park area with benches, no sidewalks <br />because of restricted access and they will walk in the street. There will be no playground <br />equipment, yards are very small and no outside building so there will be no attraction <br />there for children. There will be a bridge affect across the stream at the entrance and a <br />wrought iron fence. They would like to erect sale banners to advertise the condominiums. <br />The interior signage is customized and the street lights will be ornamental, which will <br />down cast the light so it will not be a big illuminator. The construction entrance will be <br />tucked away from Knightsbridge towards the east end of the property. All of the <br />infrastructure will be put in first, then phase 1,2, & 3 and completed build out will be <br />twenty-four (24) to thirty (30) months time period. They said all fencing would be <br />stained black cedar. The streets will be twenty-four (24) feet and this will allow fire <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.