My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINUTES 2005
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Redevelopment Commission Minutes
>
2003-2009
>
2005
>
MINUTES 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2014 9:02:26 AM
Creation date
6/7/2005 11:33:37 AM
Metadata
Fields
Template:
Clerk Treas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pac More to make a decision between the two properties. John said he certainly did not <br />have a problem with Holloway's proposal, so he is recommending using Holloway. A <br />lady from Pac More told the commission they are working with Holloway right now to <br />do a land study to see how much fill dirt would be needed. They really want to locate on <br />the Davee property, but fill dirt is an issue. Right now they are trying to decide if the <br />Davee property will work on should they go to the Field's property. They are committed <br />to be here in Mooresville, but there is nothing in writing. She said if it would make the <br />Redevelopment Commission feel more comfortable they could see about doing a letter of <br />memorandum. Commissioner Humes reminded the commission a letter had been <br />received in December from Pac More stating Mooresville was the chosen site. The Davee <br />Property has twenty -four buildable acres and the Field's site has probably forty buildable <br />acres. Pac More would rather not purchase the Field's property because they do not need <br />that much property. <br />The design itself would probably take about three weeks. Commissioner Ellis said if Pac <br />More is committed to one of the two properties then it would seem logical to go ahead <br />with approval of the bid. He said he would feel more comfortable with something in <br />writing as to their commitment. This could probably happen next week. <br />Commissioner Ellis made a motion with a second by Commissioner Haskins to accept the <br />bid from Ross Holloway, $2,800 to $4,300 depending on siding location and length. <br />Motion carried 4 -0. <br />A motion was made by Commissioner Ellis with a second by Commissioner Haskins to <br />adjourn the meeting. Motion carried 4 -0. <br />r <br />President <br />ATTF-ST: <br />Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.