Laserfiche WebLink
<br />I - ~ <br /> <br />MOORESVILLE PLAN COMMISSION <br />MINUTES <br />WEDNESDAY, NOVEMBER 19, 1997 <br />7:30 P. M. <br /> <br />The MooresviIle Plan Commission met on Wednesday, November 19, 1997 after the Board of <br />Zoning Appeals meeting. <br /> <br />Plan Commission members in attendance were: President Joel Beebe. SecretarY Vem Kimmel, <br />Bill Abbott, Mike Young, and John Ehrhart. Commission members Charles McGuire, Steve <br />Campbell, and Tim Bennett were absent. <br /> <br />Motion was made by Commissioner Kimmel, second by Commissioner Abbott to approve the <br />minutes of the October meeting. Motion carried 5-0. <br /> <br />First on the agenda was Hoosier Energy with a Special Exception Request to build a Transmission <br />Line that would eventually tie in at Wendy's and will service 3 Substations and to construct a <br />Distribution line to SouthBridge Crossing and they want to do both at the same time. The Board <br />of Zoning Appeals had granted the request pending the Plan Commission findings. <br />Motion was made by Commissioner Abbott, second by Commissüoner Ehrhart to fmd this request <br />is not adverse to the Master Plan. Motion canied 5-0. <br /> <br />Next on the Agenda was Ross Holloway representing Sun Polymer Corp. This was a site plan <br />approval for Block B in Meadowbrook Business Park. Tech notes: a combination utility and <br />drainage 50 foot wide easement, all of which would be owned and maintained by Sun Polymer. <br />All internal roads maintained by Sun Polymer. The force main from the Lift Station to gravity <br />sewer is the only thing the Town of Mooresville would maintain. A 70 foot setback for the <br />building. Target date for the first facility completion is set for August of 1998. Improvements are <br />not on the railroad right of way. There was a discussion of who owns 133 feet ofstreet-- the <br />solution was to move the property line in the area of the Street o~ up to the existing Street. <br />Motion was made by Commissioner Abbott, second by Commissioner Kimmel to approve final <br />Plat subject to: 1. Construction prints approved by Inspector Joe Beikman including combination <br />easement. 2. Maintenance bond for existing streets. 3. moving property line of street (133.66 <br />feet) 4. Availability fees paid. 5. Hydrant locations approved by Fire ChiefLes Farmer. Motion <br />carried 5-0. <br /> <br />......- <br /> <br />Ross Holloway of Holloway & Associates then presented a two lot minor plat for Roy Terrell. <br />This is at the intersection of St. Rd 67and Highway 144, the northwest parcel. This is to develop <br />into two lots. The smaller lot is where the existing house is located, the second lot the one where <br />the store is located. This parcel was rezoned approximately two months ago. It is zoned B-3. A <br />resident, Mr. Robert Geiger spoke to the Commission relating he wanted Development limited in <br />the Flood Plain. After much discussion a motion was made by Commissioner Abbott, second by <br />Commissioner Ehrhart to approve the two lot Minor Plat subject to the Floodway being shown on <br />the Plat. Motion canied 5-0. <br /> <br />Next, Ross Holloway presented the Bartrum Two Lot !vfinor Plat. This property is located on <br />