My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TC 2004
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Town Council Minutes
>
2000-2009
>
2004
>
TC 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2008 12:51:47 PM
Creation date
12/30/2008 12:51:42 PM
Metadata
Fields
Template:
Clerk Treas
DATE
2008-12-30
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hers from the Boyd Heights Subdivision on of Phase~I to begin.~'~° <br />Several homeow uest fzom <br />construction easements, who beep changed by Attorney, Tim Curre sto a the easement <br />wording of the easements <br />the Nance and Cline families to read ` o effort would be ma e to re <br />xe the construction, including the restoration of <br />area to the same condition it was in be d Hei his <br />e or storage shed to it's original location:' e 1 ~oP ~ soU~ ~~ Boysent g <br />any fenc <br />representing his daughter and ex wife, to find out p to a the cast of <br />lei that they own is not currently in livabeefox h mon puy to a failing <br />Protect. The dup <br />et his daughter's property to where she could <br />septic system.. l~le asked th~S if incoxder to oguld be posse road frontage to be <br />hooking onto the sewer h ant ex lamed that he had to have <br />rent it out again. Councilman Bry p resent at the <br />t and that they were three construction ea oineowners we pbeing ab e o <br />able to do tha ou of <br />run the line down 1Vleadow~ Town Attorney, Tim Cues spoke to the gr p <br />meeting to sign. At that ti <br />ers who were present to sign the easementsr tr o hat he h• s on his prop rty <br />homeown <br />them. Mark Bryant was concerned about some xna <br />• the middle of the twelve foot easement. Hek ~ Apo Be~km~ f the line <br />that are located in <br />removed due to the sentimental of the easementl MrB. Be'ikman stated that goine su ested <br />gg <br />has to be down the exact center <br />an here within twelve feet of the trees eves thebtreels wou d be more 1 kely to survieves <br />yam' <br />that they born under them instead. He b B ant stated that boring under the ~ <br />with boring under the root system. Councilman ~' even by Tony <br />to o along <br />would most likely cost about $2500. `~`D len ~~t~ he wou d be willing g note <br />Perry of Perry Excavating. Councilma <br />Tim Currens stated that the Council could a r a tdame fam~ or instal ng the <br />with that. <br />for boxing at a later date. He then asked Tony Peary o or construction <br />sewer lines so that he could put a d~op-a d be neg, don in six y days. Tim Cu ~e ts'met°d <br />easements. Mr. Perry stated he an P <br />he thought he should use the date of July 1, 2005 to make suxe to allow a equ <br />Mark D. Bryant, David & .Anita <br />Construction easements for Phase I were signeid b Mr. Cline was not present but was to <br />Nance, Pamela Jo and Josh Scott and Mrs• <br />eix easement the following day at Tim Curxens' office. Jeff Pipkin, who is a <br />sign th <br />Notary Public, notarized the signatures. <br />struction bids for Boyd Heights was bid in thre hPWauld take t Mlin up M~dow <br />The con <br />signature the construction fox Phase I could begin, w c <br />•ervice the residents of Meadow Lane. 't'here wereThe s and bid was fromase <br />Iane ands Excavating for $59,gb9.21. <br />I. The fast one was fzom Perry ent on signatures from a marred <br />Swinney Brothers Excava ~ add-onto~Phas O could begin. The add-on is the <br />couple, construction for th <br />North/South line, which would service 1o0ts 5, 8, 9 and 10. The bid from eny <br />Winne Brothers Excavating bid was <br />Excavating for Phase IA was $ l2, 053.0 <br />$14,144A0. <br />Councilman Bryant, to accept the <br />A motion was made by Councilman DoExcavat ng, b ontingent upon the signatures still <br />lowest bid on both projects from Perry <br />needed to allow Phases I and IA to begin. Motion carried 5-0. for <br />Qrdinance 11-2003, which is <br />In other business, President Worthen read from Salary <br />ar 2004, the salary for the position of Utility Department Supervisor~Tlas~~alary <br />the ye <br />was set at $35,320.00. President Warthento that t os t onnci1,lhie Coup ~1 a~eed it was. <br />acceptable if they were to name someone P <br />ecutive session on June 19, 2004, the Council intee i st t dsthat pp~ ants for the <br />Dunng ex <br />pasiti°n of Utility DepartmecanSd dates fox the position. a <br />applicants were very strong <br />as made by Councilman Bryant, second by Councilman Dolen to hire David. <br />A motion w <br />re as the Utility Department Supervisor. Nlotio t ~~~~ ez~ yow~~~ing °n ~~ a ~ <br />Moo <br />opposed. In order to allow David to finish the proJec <br />street d p ee, it was decided he would be in his new........ <br />e artment employ ~ -_. _ _ .- .--- --- ~ -- -- - - _. position on July 26 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.