My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC 2005
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Plan Commission
>
2000-2009
>
2005
>
PC 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2013 10:48:52 AM
Creation date
2/8/2013 10:48:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Commissioner Ehrhart asked in accessing lots 30, 31, 32, and 33 there is not an alley <br /> behind these. Mr. Holloway said there would be a common access from between lot 102 <br /> and 103. Commissioner Young asked if the garages would not face the street and would <br /> all the utilities would be behind the homes and Mr. Holloway said that was correct. He <br /> said unfortunately there would be a few transformers and fire hydrants along the street. <br /> He said the transformers will be landscaped. <br /> Motion to approve Section Two final plat for Village of Eastmore was made by <br /> Commissioner Ehrhart, second by Commissioner Berwick. Motion carried 7-0. <br /> Ross Holloway, Holloway Engineering, representing Larry Neer, for plat approval for <br /> PUD-R named Bridgemore Village, formerly Amberwood, which is a Condominium <br /> concept and the preliminary plat will carry the covenant and restrictions and <br /> condominium by-laws. Karen and Larry Neer have a project in Westfield so you could <br /> get a feel for this project. The parcel is twenty-three point nine (23.9) acres and <br /> everything outside the walls of the condominium units will be common area and parks <br /> that will be maintained by the condominium homeowners association. There will be one <br /> hundred eight(108) homes plus one clubhouse. This parcel is currently approved for <br /> eight-eight (88)units with no clubhouse and amenities. Gross density is 4.5 homes per <br /> acre which is not too far off from what has been approved for this site, which is 3.3 and <br /> 4.2. It is currently zoned PUD-R so it does not have to go before the town council. <br /> They have given an annexation request to Mr. Currens, which is signed and notarized by <br /> the owner, and they meet the one-eighth contiguity required for annexation. The <br /> development standards will apply to all of these homes with the exterior being brick, <br /> stone, wood or hardy plank. The brick is balanced completely around the side of the <br /> unit, the landscaping is detailed and they have 8/12 pitch roofs. They will present a <br /> landscaping plan to the plan commission in detail for every unit. All homes will have <br /> hard surface drives and 12 pitch roofs. The minimum square footage will be 1325 sq. ft. <br /> and the average will probably be 1800 to 2000 sq. ft. and all will have a two (2) car <br /> attached garage. All of the landscaping, driveways, streets, exterior of building, <br /> stormwater system, retention areas and everything will be maintained by the homeowner <br /> association. Nothing will be dedicated to the town of Mooresville except the sanitation <br /> system and easement will be provided for the sanitary sewer that is acceptable to the <br /> town. They will have private streets and restrictive entrance so they can maintain the <br /> traffic. There will be a clubhouse of 2900 sq. ft. which will be built first and it will have <br /> a 20 X 39 foot pool. There will be a walking path, park area with benches, no sidewalks <br /> because of restricted access and they will walk in the street. There will be no playground <br /> equipment, yards are very small and no outside building so there will be no attraction <br /> there for children. There will be a bridge affect across the stream at the entrance and a <br /> wrought iron fence. They would like to erect sale banners to advertise the condominiums. <br /> The interior signage is customized and the street lights will be ornamental, which will <br /> down cast the light so it will not be a big illuminator. The construction entrance will be <br /> tucked away from Knightsbridge towards the east end of the property. All of the <br /> infrastructure will be put in first, then phase 1,2, & 3 and completed build out will be <br /> • twenty-four(24) to thirty(30)months time period. They said all fencing would be <br /> stained black cedar. The streets will be twenty-four(24) feet and this will allow fire <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.