My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AUG. 26, 1993
Town-of-Mooresville
>
PUBLIC DOCUMENTS ON LINE
>
MINUTES
>
Plan Commission
>
1990-1999
>
1993
>
AUG. 26, 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 10:12:51 AM
Creation date
5/20/2005 11:50:37 AM
Metadata
Fields
Template:
Plan Commission
NAME
AUG. 26, 1993
Plan Commission - Type
Minutes
DATE
1993-08-26
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'--- <br /> <br />ZONING ORDINANCE CHANGES <br /> <br />1. Subdivision Control Ordinance under minor plat, page 9 <br />adding a new paragraph 20, we are deleting the old paragraph 20 <br /> <br />"Any plat that adjoins a county road must designate and grant a <br />dedicated 25 foot right-of-way to Morgan C6unty unless the County <br />waives the same in writing". <br /> <br />2. Also, page 9 paragraph 18, to read as follows: <br /> <br />"A statement certified by a registered engineer or registered <br />land surveyor stating that the development will -not increase the <br />downstream hydraulic peak of the waterway in which water shed the <br />property is located for a 50 year storm frequency". <br /> <br />3. On page 9, adding a paragraph 21: <br /> <br />"A statement certified by a registered engineer or registered <br />land surveyor stating that the detention and retention areas for <br />on site post-development drainage should not exceed pre- <br />development drainage for fifty ýear storm frequency". <br /> <br />'--' <br /> <br />4. On page 4 of the subdivision control ordinançe add the <br />following: <br /> <br />"A statement certified by a registered engineer or registered <br />land surveyor stating that development will not increase the <br />downstream hydraulic peak of the waterway in which watershed the <br />property is located for a fifty year storm frequency. <br /> <br />And add: <br /> <br />, <br />"A statement certified by a registered engineer or registered <br />land surveyor stating that the detention and retention areas o~ <br />sight post-development drainage should not exceed pre-development <br />drainage for fifty year storm frequency. <br /> <br />5. On page 71 add: <br /> <br />VII: "A statement certified by a registered engineer or <br />registered land surveyor stating that the development will not <br />increase the downstream hydraulic peak of the waterway in which <br />watershed the property is located for a fifty year storm <br />frequency". <br /> <br />VIII: "A statement certified by a registered engineer or <br />registered land surveyor stating that the detention and retention <br />areas on site post-development drainage will not exceed pre- <br />development drainage for a fifty year storm frequency". <br /> <br />'--' <br />
The URL can be used to link to this page
Your browser does not support the video tag.